Verify that the proper dual injection head type is installed
2. Verify that the secondary control unit is properly connected to the primary control unit
3. Verify that the secondary control unit LED is on and has battery.
Verify that the proper dual injection head type is installed
2. Verify that the secondary control unit is properly connected to the primary control unit
3. Verify that the secondary control unit LED is on and has battery.