Verify a proper connection of the vaccine tube between the hand unit to the control unit.
Please pay attention:
The vaccine tube from the primary control unit should be connected to Port A on the Hand Unit.
If you have a dual system configuration- the tube from the secondary control unit should be connected to Port B on the Hand Unit.
Verify a proper connection of the injection head.
Verify a proper communication cable connection between the hand unit and the control unit.
Verify you are fully pressing the hand unit trigger.
Routine injection process is not starting

Written by Hadas Movshovitz
Updated over 2 years ago